Oliver’s Twist: Letwin’s Proposals For Large Housing Sites

Sajid Javid had given Sir Oliver Letwin the following terms of reference for his review into the “build out of planning permissions into homes” that was announced in the Autumn 2017 budget.

The Review should seek to explain the significant gap between housing completions and the amount of land allocated or permissioned in areas of high housing demand, and make recommendations for closing it. The Review should identify the principal causes of the gap, and identify practical steps that could increase the speed of build out. These steps should support an increase in housing supply consistent with a stable housing market in the short term and so that over the long-term, house prices rise slower than earnings. The review will provide an interim report to the Chancellor of the Exchequer and the Secretary of State for Housing, Communities and Local Government in time for Spring Statement 2018 and a full report for Budget 2018.”

Has Letwin’s final report (published alongside the budget on 29 October 2018) twisted itself away from the examination question that he was set? In my view, read as a set along with the previous two stages of his work, it is pretty clear how his thinking has developed. But he has ended up making a surprisingly radical and, to my mind, impractical, set of recommendations that surely will not find traction with this Government and which on any reflection would surely not increase the “speed of build out“. Perhaps due to the deadline he was set, the recommendations in the final report are not accompanied by any evidence. They are also set out in some detail (see for example the tables embedded in a later part of this blog post) at the expense of any commentary on, for example, the proposals to encourage timely delivery that were set out in the February 2017 white paper.

Dear Philip and Sajid

There have been three stages to his work. In his 9 March 2018 letter to the Chancellor and Secretary of State he provided this initial analysis:

The fundamental driver of build out rates once detailed planning permission is granted for large sites appears to be the ‘absorption rate’ – the rate at which newly constructed homes can be sold into (or are believed by the house builder to be able to be sold successfully into) the local market without materially disturbing the market price. The absorption rate of homes sold on the site appears, in turn, to be largely determined at present by the type of home being constructed (when ‘type’ includes size, design, context and tenure) and the pricing of the new homes built. The principal reason why house builders are in a position to exercise control over these key drivers of sales rates appears to be that there are limited opportunities for rivals to enter large sites and compete for customers by offering different types of homes at different price-points and with different tenures.

When a large house builder occupies the whole (or even a large part) of a large site, the size and style (and physical context) of the homes on offer will typically be fairly homogeneous. We have seen examples of some variation in size, style and context on some large sites; but the variations have not generally been great. It has become apparent to us that, when major house builders talk about the absorption rates on a large site being affected by “the number of outlets”, they are typically referring not only to the physical location of different points of sale on the site, but also and more importantly to differences in the size and style (and context) of the products being offered for open market sale in different parts of the site. Even these relatively slight variations are clearly sufficient to create additional demand – and hence additional absorption, leading to a higher rate of build out.

It is also clear from our investigation of large sites that differences of tenure are critical. The absorption of the ‘affordable homes’ (including shared ownership homes) and of the ‘social rented housing’ on large sites is regarded universally as additional to the number of homes that can be sold to the open market in a given year on a given large site. We have seen ample evidence from our site visits that the rate of completion of the ‘affordable’ and ‘social rented’ homes is constrained by the requirement for cross-subsidy from the open market housing on the site. Where the rate of sale of open market housing is limited by a given absorption rate for the character and size of home being sold by the house builder at or near to the price of comparable second-hand homes in the locality, this limits the house builder receipts available to provide cross-subsidies. This in turn limits the rate at which the house builder will build out the ‘affordable’ and ‘social rented’ housing required by the Section 106 Agreement – at least in the case of large sites where the non-market housing is either mixed in with the open market housing as an act of conscious policy (as we have frequently found) or where the non-market housing is sold to the housing association at a price that reflects only construction cost (as we have also seen occurring). If freed from these supply constraints, the demand for ‘affordable’ homes (including shared ownership) and ‘social rented’ accommodation on large sites would undoubtedly be consistent with a faster rate of build out. And we have heard, also, that the demand for private rented accommodation at full open market rents (the scale of which is at present uncertain) would be largely additional to, rather than a substitute for, demand for homes purchased outright on the open market.

The interim report

His interim report in June 2018 then focused on three issues:

• what the build out rate on large sites in areas of high housing demand actually is;

• why the rate of build out on these sites is as it is; and

• which factors would be most likely to increase the rate of build out on these sites without having other, untoward effects.

The interim report is a solid document with strong analysis and a variety of conclusions, one of which being that “if either the major house builders themselves, or others, were to offer much more housing of varying types, designs and tenures (and, indeed, more distinct settings, landscapes and street-scapes) on the large sites and if the resulting variety matched appropriately the desires of the people wanting to live in each particular part of the country, then the overall absorption rates – and hence the overall build out rates – could be substantially accelerated. The policy levers required to bring this about without damaging the economics of individual sites or the financial sustainability of the major house builders are topics for the second phase of my work, on which I shall report at the time of the Budget.”

The final report

And this is precisely what he has sought in part to do in his final report, published alongside the budget on 29 October 2018. I say in part, as there is no real analysis as to whether his proposed policy levers would or would not damage “the economics of individual sites or the financial sustainability of the major house builders“.

Underlying his conclusions seems to be his scepticism as to whether the encouragement in the NPPF for “residential developments to have a mix of tenures, types and sizes which reflect local housing demand (as well as emphasising the importance of good design)“, together with the 2018 NPPF’s requirement for local authorities to encourage the sub-division of large sites, is sufficient to lead to less homogenous development or “the prospect of significant increases in the rapidity of build out on such sites“.

He gives no evidence for this assumption. Even the 2012 NPPF (as now revised) is, after all, still working through into plans and permissions.

Instead of trying to work with the grain of the existing system, he recommends that “the Government should adopt a new set of planning rules specifically designed to apply to large sites. The purpose of these rules should be to ensure that all sites in areas of high housing demand whose size exceeds a certain threshold are subject to an additional form of planning control that requires those owning such sites to provide a diversity of offerings on the site which are able to address the various categories of demand within the local housing market. This, in turn, should ensure that houses can be built at a greater rate than at present on such sites, because the absorption rate for each category of housing will be complementary, yielding, overall, a greater absorption of housing by the local market as a whole in any given period.”

Ahead of a new legislative structure (both primary and secondary legislation) and an annex to the NPPF (I suspect it would take more than an annex – he’s driving a coach and horses through the thing as far as large housing sites are concerned), he envisages that the new rules could first be brought in by a written ministerial statement, secondary legislation and the policy annex. “If, for example, the Government decides to adopt my recommendations at the end of 2018, I suggest that it should be made clear to the owners of existing large sites in areas of high housing demand, and to those who are taking such large sites through the current planning system before commencing works, that the new rules governing planning permission for large sites will come into force at the start of 2021, and will therefore govern any permissions granted for large sites on or after that date.”

The primary legislation would:

” • define large sites both in terms of a size threshold (which might, for example, be set initially at 1,500 units2) and in terms of boundaries (to ensure that a site which is allocated as a single entity in a local development plan qualifies, even if it benefits from a number of different outline planning permissions);

• require local planning authorities, when granting allocations, outline permissions or final planning permissions for any large site or any part of a large site in areas of high housing demand, to comply with the new secondary legislation and the new planning policy relating to large sites – and, in particular, to include within all outline planning permissions for large sites in areas of high housing demand a requirement that ‘housing diversification’ on such sites should be a ‘reserved matter’; and

• establish the principle that all permissions for reserved matters granted in relation to such large sites should contain diversi cation requirements in accordance with the new secondary legislation and the new planning policy for large sites.”

The secondary legislation would:

” • amend the Town and Country Planning (Development Management Procedure)(England) Order 2015 to include type, size and tenure mix (alongside the current provision for prescription of access, appearance, landscaping, layout and scale) as characteristics that can be prescribed as reserved matters for large sites in areas of high housing demand; and

• require any applicant making an outline planning application for a large site or an application for final permission for a phase of a large site in an area of high housing demand to prepare a diversification strategy, specifying the types of diversity that will be exhibited on that site or in the part of the site to which the application refers.”

The new planning policy document would set out the diversification principles that are to apply to such large sites in areas of high housing demand in the future. By diversification, he means, for example, “housing of varying types, designs and tenures including a high proportion of affordable housing“, as well as “more distinctive settings, landscapes and streetscapes“. By all means strengthen the NPPF if further strengthening is needed (is it?) but how much of this is specific to schemes of 1,500 homes plus.

Then it really starts to get weird. Because there will be “scope for disagreement about whether a particular applicant has made a genuine effort to provide sufficient diversity to address multiple markets simultaneously and hence to increase the overall absorption rate and build out rate. Accordingly, in order to minimise recourse to appeal or litigation, I recommend that the Government should establish a National Expert Committee.

The primary purpose of this Committee should be to arbitrate on whether any application that causes a disagreement between the local planning authority and the applicant (and consequently comes to appeal) satisfies the diversification requirement, and is therefore likely to cause high build out rates.

The secondary purpose of the Committee would be to offer informal advice to any developer or local planning authority that was considering a large site application. I recommend that the Housing Secretary should guide local planning authorities to consult the National Expert Committee before approving any such large site application in an area of high housing demand.”

Why on earth would a new quango such as this be created?

For sites that will already have an outline planning permission before 2021, Letwin recommends that there should be financial incentives (ie government funding) for house builders to accept changes to their existing site plans. Developers would enter into a section 106 agreement to document their continued commitment to the diversity requirements. Letwin says that he has taken legal advice and is confident that the “voluntary transaction” that he proposes will prove to be lawful – perhaps, but it would certainly be unusual. Would the local planning authority be a party? Who would enforce?

One Step Beyond

He then goes “one step further” in relation to “large sites that have yet to be allocated within a local authority’s local plan“. He recommends “that the Government should, as part of the new primary legislation, introduce a power for local planning authorities to designate particular sites within their local plans as sites which can be developed only as single large sites and which therefore automatically become subject to the new planning rules for large sites. In addition, I believe that the local planning authority should be empowered to specify, at the time of designation, strong master-planning requirements including a strict design code as well as landscaping and full and specific infrastructure requirements.”

This in part appears to be a device to ensure that “the land value of those sites is not raised as far above the alternative use value as would be the case if a site were allocated in a local plan and subsequently obtained outline permission under our current rules“. But this can already be done by local planning authorities for good planning reasons, where comprehensive development is required for reasons of, for instance, sustainability or viability. Is Letwin going further than that?

What if there is no good planning reason why the site could not be sustainably be built out in parts? And what is indeed a single development? This will all prove hugely contentious. Particularly given that he goes on to indicate that to “ensure that a reasonable balance is struck between promoting the public interest through increased diversity and faster build out rates on the one hand, and proper recognition of the value of the land on the other hand, I recommend that the Housing Secretary (when issuing updated viability guidance alongside the new planning framework) should guide local planning authorities towards insisting on levels of diversity that will tend to cap residual land values for these large sites at around ten times their existing use value.”

No evidence is given as to why the level above which land values would be expropriated by the state without compensation (which, after all, would be the effect of the proposal) is set at 10 x EUV.

Letwin recognises that significant support will be needed from Homes England: “planning rules are by their nature passive and reactive. They can prevent things from happening (if they are properly enforced); but they can only do a very limited amount to encourage applicants to follow the spirit of the rules and hence to achieve fully the outcomes the rules have been created to achieve.”

He then goes on to visualise local authorities being empowered to bring forward sites themselves via a development vehicle, in one of two ways:

(a) the local authority could use a Local Development Company (LDC) to carry out this development role by establishing a master plan and design code for the site, and then bringing in private capital through a non-recourse special purpose vehicle to pay for the land and to invest in the infrastructure, before “parcelling up” the site and selling individual parcels to particular types of builders/providers offering housing of different types and different tenures;”

(b) the local authority could establish a Local Authority Master Planner (LAMP) to develop a master plan and full design code for the site, and then enable a privately nanced Infrastructure Development Company (IDC) to purchase the land from the local authority, develop the infrastructure of the site, and promote a variety of housing similar to that provided by the LDC model described above.

He sees local authorities that use these vehicles being given “clear” compulsory purchase powers over the large sites that the authorities allocate and indicates that “it would also make sense to consider the possibility of giving local authorities such CPO powers in relation to large sites that have been allocated in their local plan in the past but which have not obtained outline permission after a long period has elapsed.”

Even when compulsory purchase compensation values have been reduced by the mechanisms requiring build out as a single site (query how that is defined in practice) and by increasing the required diversity until the 10 x uplift on EUV is not exceeded, will development (with the required diversity) be viable for a local authority to bring forward? Will any authority have the resources for the task? Will non-recourse lending really be available to the extent that would be required? Why would anyone start on the process of promoting a large site for development when it can be snaffled as part of a larger “single site” in this way?

The notions in the report could be read as moving to the public sector the role of strategic land promotion companies, which I suspect (for all that they are maligned) to be responsible for a high proportion of the major housing sites that do come forward at present. So, to misappropriate Kit Malthouse’s recent analogy that he applied to Homes England, we would lose some WD40 in the system: the companies with the incentive to identify sites, assemble them, identify and overcome infrastructure constraints, devise a viable and acceptable form of development, pursue allocation and permission, open up land with strategic infrastructure and dispose of parcels to house builders. And, going back to the original terms of reference, this will “increase the speed of build out“?

I appreciate that this report was delivered to a deadline, which it achieved, but (unlike the previous stages of Sir Oliver’s review) it seems to me to lack any robust evidential basis at all to justify the wholly new structure that it proposes for allocating, permitting and delivering schemes with 1,500 or more dwellings. Nor does the review interest itself with any more practical nudges that could be introduced into the current system. If it just goes on the “nice but radical ideas” shelf, another year will have been wasted, without any real progress towards making practical improvements that might improve build out rates. After all, Homes England is already playing a hugely positive role in unlocking large-scale housing development and indeed on 30 October 2018 published its strategic plan for 2018/2019 – 2022/2023, setting how it intends to go much further to use its “land, money, powers and influence to increase the pace, scale and quality of delivery“. When the Government responds to the Letwin report in early 2019 I will be looking to see whether any measures that are to be taken forward will pragmatically assist Homes England’s practical work – they are the ones rolling up their sleeves on all this.

Lastly, if as a consequence of implementation of these proposals we were to see the private sector focusing its attention on smaller sites, in preference to these sites which can really make a difference in terms of delivering at scale, that would in my view be inconsistent with the brief that was set.

Stick or twist?

Simon Ricketts, 3 November 2018

Personal views, et cetera

PS No sooner had I finished this post and poured some strong coffee than I saw this morning’s announcement that the Secretary of State has appointed Professor Sir Roger Scruton to chair a ‘Building Better, Building Beautiful’ Commission – no-one could criticise the current build out rate of MHCLG when it comes to reports and reviews.

LAMP lighter