Through A Glass Darkly: To BRE Or Not To BRE

How to determine whether the impact from a proposed development on the daylight and sunlight enjoyed by neighbours, or to be enjoyed by future occupiers of the scheme, is appropriate? That is the question. 
The problems are multi-layered:
– There is no practical guidance in the NPPF or NPPG as the approach to be taken.
– Many local planning authorities default in their policies to requiring compliance with a guide to good practice published by the Building Research Establishment in 2011: “site layout planning for daylight and sunlight: a guide to good practice” (BR 209) by Paul Littlefair (a document incidentally not freely available but available for purchase from the BRE for £55). 

– The document has various numerical criteria and calculations to determine acceptability. Whilst the need for flexibility in application is acknowledged in the document itself (“Although it gives numerical guidelines, these should be interpreted flexibly because natural lighting is only one of many factors in site layout design“) in practice this is often overlooked. 

– The document has not been updated to reflect changes in our understanding of what makes great places or indeed nuanced to reflect the very different expectations of those living in urban environments, and London in particular. 
The Government signalled in its February 2017 housing white paper that a new approach may be needed: “the Government intends to amend national planning guidance to highlight planning approaches that can be used to help support higher densities, and to set out ways in which daylight considerations can be addressed in a pragmatic way that does not inhibit dense, high- quality development.”
I will be disappointed if we do not see this in the draft revised NPPF (likely to be published on 5 March). 
Disappointingly, the Mayor of London has omitted specific guidance from the draft London Plan (2 March representations deadline looming). The opportunity has been missed to stress the need for flexibility and appreciation of context. Given the loss of the previous density matrices, daylighting and sunlighting issues will continue to be relied upon by objectors seeking to resist higher density schemes, which are inevitable if the housing targets in the plan are to be achieved. 
Against this context it is fascinating to read the inspector’s decision letter dated 21 February 2018 allowing an appeal by Londonewcastle for their Whitechapel Estate development, which comprises “demolition of all existing buildings and redevelopment to provide 12 buildings ranging from ground plus 2-23 storeys (a maximum 94m AOD height), comprising 343 residential dwellings (Class C3), 168 specialist accommodation units (Class C2), office floorspace (Class B1), flexible office and non-residential institution floorspace (Class B1/D1), retail floorspace (Class A1-A3), car parking, cycle parking, hard and soft landscaping and other associated works.” The site falls within the City Fringe Opportunity Area Planning Framework.
The inspector summarised the main issues as:
* “The quality of design of the appeal proposal and its effect on the character and appearance of the area and on the wider townscape;

* The effect on heritage assets and their settings; 


* The effect on living conditions of neighbouring residents, having regard in 
particular to daylight and sunlight, outlook and privacy; 


* The quality of living conditions for future residents of the development, having regard in particular to daylight and sunlight, overshadowing, outlook and privacy. ”

The inspector’s approach to daylight and sunlight is particularly interesting, given that it follows detailed evidence from, for the London Borough of Tower Hamlets, none other than Paul Littlefair, author of the BRE guide, and, for the appellant, leading consultant Gordon Ingram of GIA, proponent of a more nuanced, contextual, assessment approach. 

It is plain from the decision letter that the inspector preferred the GIA methodology:
107. It is agreed that the starting point in the assessment of the effect on residents’ living conditions arising from daylight and sunlight should be the Building Research Establishment 2011 publication Site layout planning for daylight and sunlight: A guide to good practice, (‘the BRE guide’) whose author gave evidence at the Inquiry on behalf of the Council. Use of this methodology is demanded by the supporting text to MDD Policy DM2539 and by the Mayor of London’s Housing SPG of March 2016. 

108. The BRE document offers guidance on generally acceptable standards of daylight and sunlight, but advises that numerical values are not to be rigidly applied and recognises the importance of the specific circumstances of each case. Inner city development is one of the examples where a different approach might be justified. This is specifically endorsed by the Housing SPG, which calls for guidelines to be applied sensitively to higher density developments, especially in (among others) opportunity areas and accessible locations, taking into account local circumstances, the need to optimise housing capacity, and the scope for the character and form of an area to change over time. This approach is clearly relevant to the appeal site. The area’s identification for transformation through high density housing development indicates high scope for its form and character to change over the short and longer term. I agree with the appellants that blanket application of the BRE guide optimum standards, which are best achieved in relatively low-rise well spaced layouts, is not appropriate in this instance.
112. The figures show that a proportion of residual Vertical Sky Component (‘VSC’) values in the mid-teens have been found acceptable in major developments across London. This echoes the Mayor’s endorsement in the pre- SPG decision at Monmouth House, Islington that VSC values in the mid-teens are acceptable in an inner urban environment. They also show a smaller proportion in the bands below 15%. Even if there were some discrepancy in the appellants’ figures for this lower band at Whitechapel Central, which is disputed, the VSC outcomes for the appeal proposal would in general be very similar to those of the other major schemes. The appeal proposal would therefore appear to be in compliance with the LP as amplified by the SPG and as it is being interpreted by the Mayor. The GLA responses to the planning application did not raise any concern about neighbours’ amenity. 

113. I acknowledge that a focus on overall residual levels could risk losing sight of individual problem areas. It is accepted that light is only one factor in assessing overall levels of amenity, but I consider that the trade-off with other factors, such as access to public transport or green space, is likely to be of more relevance to an occupier of new development than to an existing neighbour whose long-enjoyed living conditions would be adversely affected by new buildings. However, I also consider that Inner London is an area where there should generally be a high expectation of development taking place. This is particularly so in the case of the appeal site, where the WVM and the OAPF have flagged the desirability of high density development. Existing residents would in my view be prepared for change and would not necessarily expect existing standards of daylight and sunlight to persist after development.”
121. As in the matter of daylight, the guidance on loss of annual and winter sunlight is not to be rigidly applied. Emphasis on the level of retained sunlight rather than degree of change would be justified. On balance, I accept the appellants’ conclusion the proposal’s overall effect on sunlight would not be significantly adverse.”
As to the effect of the scheme on living conditions for neighbouring residents:
125. I conclude that the proposal would result in some significant individual reductions in daylight and sunlight levels, but that this is almost unavoidable in achieving the policy requirement for high density development in a confined urban setting. The new buildings would for the most part be comparable in height with the existing and would re-define traditional street frontages. Retained levels of daylight and sunlight would be adequate and comparable with existing and emerging urban conditions. The effects would appear very comparable with those recently allowed by the Council at Whitechapel Central. There would be minimal adverse losses of outlook and increases in overlooking. Taken as a whole, the proposal would not result in unacceptably harmful effects on living conditions and would comply with the development plan in this respect. ”
Whilst of course individual decisions of inspectors are not formal precedents, and every scheme is dependent on its individual circumstances and the relevant local policy background, this decision is undoubtedly important and surely fully in line with what the Government was flagging in the housing white paper. 
The BRE guidance in part draws upon British Standard BS 8206-2 (2008) Lighting for Buildings – Part 2: Code of Practice for Daylighting. I am wondering whether one reason that the 2011 guidance has not been updated is that the British Standards Institute has been working with other EU member states’ standards institutes on a new voluntary set of standards for natural daylight, via the European Committee for Standardisation. During this process, revisions of the relevant standard at a domestic level must be placed on hold. Following consultation, a new ECS standard was ratified on 8 February 2018 and will be formally available from 25 April 2018. More information as to the tighter criteria that the new standard will introduce is set out in a useful (subscription-only I am afraid) Planning Resource piece by Gregory Francis of GVA Schatunowski Brooks. 
So, on the one hand, are we at last seeing a move towards more flexible application of daylighting and sunlighting standards? On the other hand, are we are likely in due course to see a tightening of the standards themselves? I find it disappointing that the extent to which there is domestic oversight of the BRE (since 1997 not a governmental body but an independent charitable organisation) is opaque to say the least, before we even get to the complexities of the workings of the European Committee for Standardisation. The Government, and London Mayor, really do need shine a light on all of this.
Simon Ricketts, 24 February 2018
Personal views, et cetera

The Extra Care Question: RU-C2 or C3-UCO?

A long time ago in a galaxy far, far away, Parliament made the Use Classes Order. 
I referred in my 16 September 2017 blog post Class Distinctions: Planning For Older People to the blurred distinction between C2 (basically use for the provision of residential accommodation and care to people in need of care) and C3 (basically use as a residential dwelling) when it comes to “extra care” facilities for the elderly. I set out some of the criteria applied by inspectors in appeal decisions.
There was a very useful appeal decision letter last month which surely throws additional doubt upon the soundness of the curious attempt in the draft London Plan in effect to amend the Use Classes Order by policy rather than legislation, in that it seeks to deem extra care facilities for the elderly in London as falling within use class C3 (and thereby becoming subject to affordable housing and other obligations and requirements) whereas the recognised planning law position is that they are more likely to fall within use class C2. 
Draft policy H15 C states:
Sheltered accommodation and extra care accommodation is considered as being in Use Class C3. Residential nursing care accommodation (including end of life/ hospice care and dementia care home accommodation) is considered as being in Use Class C2.”
Paragraph 4.15.3 of the supporting text simply states again that “sheltered accommodation and extra care accommodation should be considered as C3 housing“, defining extra care accommodation as follows:
extra care accommodation (also referred to as assisted living, close care, or continuing care housing) is self-contained residential accommodation and associated facilities, designed and managed to meet the needs and aspirations of older people, and which provides 24-hour access to emergency support. A range of facilities are normally available such as a residents’ lounge, laundry room, a restaurant or meal provision facilities, classes, and a base for health care workers. Domiciliary care will be available to varying levels, either as part of the accommodation package or as additional services which can be purchased if required.”
First, how can it be appropriate in principle for a policy document to deem a use to be treated in a particular way in the Use Classes Order? The nature of the use and the determination of which use class, if any, it falls into, is a legal question. For instance whether planning permission would be required for a change of use would ultimately be determination by an application for a certificate of lawfulness of proposed use or development under section 191 of the Town and Country Planning Act 1990. By all means, if justified, the Mayor can determine that particular policies should apply to extra care accommodation (matters which could then be tested through the plan examination process) but his view as to which use class it might fall into has no weight in the legal determination of that question and in my view has no place in a document which is only allowed to address “matters which are of strategic importance to Greater London.

Secondly, his view, not supported by any reasoning, as to the appropriate use class do not sit easily with the conclusions that planning inspectors have come to. The most recent decision letter (22 January 2018) was by inspector Michael Boniface, where he allowed an appeal in Sidmouth, East Devon, by Pegasus Life for an “assisted living community for older people comprising extra care units, staff accommodation and communal facilities, including a kitchen, restaurant/bar/café, a well-being suite comprising gym, treatment rooms and pool, a communal lounge and storage facilities; car parking for residents, visitors and staff of the assisted living community; comprehensive landscaping comprising communal and private spaces; and associated groundworks.”
The decision letter and inspector’s reasoning is well summarised in a blog post by Housing LIN – “Planning Inspector sets out the distinctive elements of Extra Care scheme resulting in C2 Use Class conclusion” (8 February 2018). 

The inspector was presented with the Mayor of London’s position but it did not alter his conclusions on the facts of the case. 
 Thirdly, in its recent report Housing For Older People (8 February 2018) the Commons CLG Select Committee specifically considered the treatment of specialist older people’s housing in the planning system and particularly in the Use Classes Order:

125. We also heard that the “inconsistent and cumbersome” application of the C2 and C3 planning classifications to extra care housing was problematic for developers. Some local authorities apply the C2 classification, applied to residential care homes and nursing homes, to extra care housing which reduces planning charges. Others classify this type of housing as C3, along with mainstream housing, which means full charges apply. Audley Retirement argued that extra care housing should fall within the C2 class:

“Extra care is set up to fulfil many of the functions that care homes can provide in terms of care delivery as and when the resident requires it, monitored by an onsite care team and there is access to communal facilities. There are controls over who can occupy them by age and a need for care that do not exist on C3 standard dwellings.”

Extra care housing developers had a range of suggestions for countering this issue: an “extension and additional clarity” on C2 so that it captures extra care housing; the creation of a sub-section of C2 which attracts lower planning charges; and the creation of a “dedicated use class” for extra care housing which would enable planning contributions to be streamlined.

126. When we asked about this, the then Housing Minister, Alok Sharma, told us that the guidance will look at the “precise terminology that is used to describe the different types of older people’s housing”. 
The Select Committee concludes:
We believe that the level of planning contributions on specialist housing, which are increased as a result of the non-saleable communal areas which are a feature of this type of housing, is impeding the delivery of homes. We recommend either the creation of a sub-category of the C2 planning classification (which currently applies to residential care and nursing homes) for specialist housing, which would reduce the contributions required from developers, or the creation of a new use class for specialist housing which would have the same effect.”
In the light of these considerations, how can draft London Plan policy H15 C possibly be justified?
Simon Ricketts, 17 February 2018
Personal views, et cetera 

Nothing Was Delivered

“Nothing was delivered/And I tell this truth to you/Not out of spite or anger/But simply because it’s true” (Bob Dylan)

It was the first meeting on 5 February of the prime minister’s housing implementation taskforce. The subsequent press statement summarises the event as follows:
Today the Prime Minister chaired the first meeting of the Housing Implementation Taskforce at Downing Street.

She stressed the integral role all Government departments have in helping to fix the broken housing market and deliver 300,000 additional homes by the mid-2020s.

The taskforce discussed the steps Government has already taken, including further investment at the Budget, planning reform, releasing land faster, the Housing White Paper and building more affordable housing. They emphasised the key role of Homes England in driving forward change, and also focused on the supply of new housing, public sector land sales, land banking, house-building skills and building the infrastructure needed for new housing developments.

The Prime Minister reiterated that a step change was needed right across Government and that all departments needed to think creatively about how they can contribute to building the homes the country needs.
That “300,000 additional homes by the mid-2020s” reference is an interesting one, reflecting the Government’s previous 11 January 2018 announcement of the creation of Homes England:
Homes England will play a major role in fixing the housing market by helping to deliver an average of 300,000 homes a year by the mid-2020s.
This is surely a tactical step back from the Conservative party’s 2017 manifesto commitment, with no longer any pre-2022 election target:
We will meet our 2015 commitment to deliver a million homes by the end of 2020 and we will deliver half a million more by the end of 2022.”
A significant proportion of the country’s homes will need to come forward in London – the Mayor of London’s draft London Plan sets a target of around 65,000 homes a year, a significant increase from the previous plan figure of 42,000. 
These figures are only going to be achieved with a large degree of consensus between central government, the Mayor, boroughs and local communities. If I were prime minister (perish the thought) I would be worrying that in many areas, but particularly in London, there is increasing “spite or anger” (in the words of Mr Dylan). Inevitably, in any year with borough elections, planning becomes politicised but this year, with the repercussions of the Grenfell tragedy, the predictions of Conservative council losses and the internal battles within the Labour party, this is particularly so. EG has tracked the number of refusals in London up to the end of 2017. It makes for uncomfortable reading and the position will only be worsening. 


Against that background, is there a crisp appeals process? Not at all. The Planning Inspectorate’s performance statistics are still poor:


Anecdotally, many developers and authorities are keeping politically controversial decisions away from committees until the other side of the 3 May local government elections, even though the formal purdah rules, summarised in a useful Local Government Association guide, largely allow for statutory processes to carry on.
The politically charged atmosphere in many boroughs isn’t just leading to refusals of permission against officers’ recommendations – leading in turn to officers having to spend time defending appeals, with inevitable repercussions for capacity to cope with other applications in the system – but it’s impeding the work of boroughs that seek to achieve housing development, particularly in relation to estate regeneration schemes, without which those London numbers are not going to be met. 
Progress on the Haringey Development Vehicle initiative, brought forward by Haringey Council with private sector joint venture partner Lendlease, has now been halted by leader councillor Claire Kober, with no further decisions to be taken before purdah commences on 26 March until after the 3 May local election. Given that, following sustained pressure over the project, she announced on 30 January that she will not be standing for re-election, its long term future may be in doubt. This was a strategy to bring about widespread development on sites in the council’s ownership, including the proposed delivery of up to 6,400 homes. The HDV would in due course formulate development proposals for sites and make planning applications, applications which would be assessed as against planning policy, with the power for the Mayor to intervene in the usual way, but plainly in Haringey even the nature of the vehicle to be used to bring about development, presumably because of the role to be played in it by a private sector developer, was seen by objectors as unacceptable. 
There is room for debate in a democracy as to the form that regeneration should take and the extent and types of affordable housing to be provided but if the HDV is not to happen, what will? In current political and financial reality, my fear is that an opportunity to increase housing at scale, including affordable housing, will be lost. It is vital that affordable housing, with tenures to meet needs, is provided. Will the collapse of the HDV render this more or less likely? What’s the alternative? What’s the objectors’ plan? To continue this position until a 2022 general election? 
Whilst the politics played out, unpleasantly according to Councillor Kober’s account, Ouseley J was writing his judgment in Peters v London Borough of Haringey. This was a crowdfunded judicial review that had been brought on behalf of campaign group Stop HDV, seeking to establish that the council had acted outside its powers in proceeding with the project. The hearing had taken place over two days in October 2017 but Ouseley J’s judgment, over 50 pages long, was only handed down on 8 February 2018. 
The main ground of challenge was a legalistic one if ever one there was: that the council had acted outside its powers in establishing with Lendlease a limited liability partnership as the vehicle to take forward its strategic aims, on the basis that section 4(2) of the Localism Act 2011 provides that where “a local authority does things for a commercial purpose, the authority must do them through a company“. The judge rejected the argument:
To my mind, there is no doubt but that the Council’s purpose in entering into the arrangements setting up the HDV and governing its operation, including the relationship between the two partners, cannot be characterised as “a commercial purpose” within the scope of the Localism Act. Even more clearly is its dominant purpose not commercial. Any commercial component is merely incidental or ancillary, and not a separate purpose.”

“…the phrases to which Mr Wolfe took me do not show a separate commercial purpose, whether minor or not. It is important to examine why this is all being done. The purpose behind the Council’s entering into the HDV and associated arrangements is not that of a property investor, simply seeking to make a profit or to achieve a return on development or improved rentals. The purpose of the Council is to use and develop its own land to its best advantage so that it can achieve the housing, employment and growth or regeneration objectives that it has laid down. In order to achieve as much as it can, it has to achieve the best consideration on any disposal of its land; and it must be in other respects financially prudent, to produce returns in various ways which can be used to further its policy objectives. Achieving the return is neither the activity nor its purpose of itself.”

“The acquisition of other land in the context of regenerating a large estate is a commonplace, and, backed by compulsory purchase powers, it demonstrates not one whit that a separate activity of property development is being undertaken.”
In any event, the judge considered that the challenge in relation to this ground and others (lack of consultation, Equality Act) had been brought out of time. I understand that the claimant is likely to seek permission to appeal. 
In another part of London, progress is still slow on another regeneration project that has been to the High Court and back, the Aylesbury Estate. I covered in my blog post Regeneration X: Failed CPOs the decision of the Secretary of State to decline to confirm Southwark Council’s CPO based on his concern as to the effects of acquisition on leaseholders, a decision which was subsequently quashed by consent following a challenge brought by the council. A second inquiry that has been taking place into the order was adjourned on 31 January 2018 to resume for a further two weeks on 17 April. Judging from a ruling by the inspector prohibiting further filming at the inquiry it has been a lively event so far. 

According to the council’s statement of case:
The acquisition of the Order Land will enable demolition of the existing buildings in order to replace the 566 existing units of social and privately owned housing with a mixed tenure development comprising 830 homes. Of these, 304 will be social rent, 102 will be intermediate (affordable homes available as shared ownership or shared equity) and 424 will be private (of which 48 will be for open market rent and the remainder for sale). Included in the social rent homes are 50 extra care units and 7 units for people with learning difficulties.”
Inevitably, whatever the gains in housing numbers to be achieved (and indeed the affordable housing of all tenures to be provided), there will be legitimately held concerns on the part of residents directly affected. The Mayor announced on 2 February 2018 “mandatory ballots of residents for schemes where any demolition is planned as a strict condition of his funding“. 
Meanwhile, elsewhere in Southwark, Delancey has continued to face resistance in relation to its proposed redevelopment of the Elephant and Castle centre. At a committee meeting on 16 January, members overturned an officer’s recommendation to grant planning permission. A final decision has now been deferred, following a revised offer as to affordable housing and other commitments reportedly made by the developer. 
Delivery of the right schemes, in a way which maximises the potential for affordable housing and the wide range of other requirements set out in the draft London Plan will not be easy. How will land owners and developers respond? Will the Mayor continue to intervene to direct refusal where the affordable housing proportion offered is considered to be less than the maximum reasonably achievable? Will he use his call-in powers where boroughs unreasonably withhold permission for schemes which would deliver homes at scale? The Government had proposed back in 2015 reducing the threshold above which the Mayor could intervene on planning applications from 150 to 50 homes but unless the Mayor is seen as using his existing powers regularly and proactively to increase housing delivery, this may remain on the Government’s to-do list. 
The housing numbers that the Government is targeting will not be achieved without an active and engaged private sector. What if land owners choose not to release their land? There is a remarkable degree of consensus between the Conservative and Labour parties as to the desirability of using compulsory purchase powers. I covered the Conservative party’s manifesto thinking in my blog post Money For Nothing? CPO Compensation Reform, Land Value Capture (20 May 2017), in which I tried to set out some of the complexities arising from any proposal to change CPO compensation principles so as to strip out planning “hope” value (as opposed to just being smarter about using CPO powers in a way that hope values haven’t arisen in the first place). There was much publicity this month arising from an announcement from Labour shadow minister John Healey reported in the Guardian on 1 February that “Labour is considering forcing landowners to give up sites for a fraction of their current price in an effort to slash the cost of council house building“. 
Landowners currently sell at a price that factors in the dramatic increase in value when planning consent is granted. It means a hectare of agricultural land worth around £20,000 can sell for closer to £2m if it is zoned for housing.

Labour believes this is slowing down housebuilding by dramatically increasing costs. It is planning a new English Sovereign Land Trust with powers to buy sites at closer to the lower price. 

This would be enabled by a change in the 1961 Land Compensation Act so the state could compulsorily purchase land at a price that excluded the potential for future planning consent.”
I haven’t seen any more detailed analysis of the proposal or indeed any fleshing out of the idea of an English Sovereign Land Trust. Personally I would prefer to see Homes England grasp the nettle, with their existing wide compulsory purchase powers, to acquire sites at a scale which would be difficult to achieve without compulsory purchase, thereby minimising “no scheme world” values. Labour’s English Sovereign Land Trust concept sounds very rural in concept and not a substitute for facing up to difficult challenges about maximising use in cities of public sector land, about densifying suburbs and about effective approaches to estate renewal. 
And given the supposed cross-party support for increasing housing delivery, wouldn’t it be good to try to depoliticise the process where we can, rather than demonise the participants whether from public or private sector? I’ve previously blogged about the multiplicity of reviews being undertaken, to which list can now be added the CLG Commons Select Committee’s land value capture inquiry, for which the deadline for evidence is 2 March 2018). What scope can we find for consensus, about priorities, about the respective roles of the public and private sector, about funding of social housing and about the appropriate use of compulsory purchase?
Simon Ricketts, 10 February 2018
Personal views, et cetera

Restricting Pre-Commencement Conditions: It Will Be A Start

A few words on planning law before something more important. 

This week it was good to see MHCLG’s consultation document Improving the use of planning conditions: consultation on draft regulations (30 January 2018). Unnecessary pre-commencement conditions and the jams caused to project programmes are a pain. However, I’m not sure that this remedy is the panacea (I’m trying to resist the temptation to coin the term “planacea”, oh..). 

 What is proposed is that any decision maker cannot grant planning permission containing a pre-commencement condition unless the applicant has either agreed to the terms of the condition or hasn’t responded within ten working days.

 That is positive and should reflect good practice, certainly on bigger schemes where lists of draft conditions are shared by officers for discussion with the applicant prior to permission being issued. However, as usual, if you delve into the legal detail, I’m not sure that the mechanism will be as broad in its scope as you might think, due to the definition of “pre-commencement condition” in the parent legislation. Section 100ZA(8) Town and Country Planning Act 1990, introduced by section 14(1) of the Neighbourhood Planning Act 2017, defines “pre-commencement condition” as:

 “a condition imposed on a grant of planning permission (other than a grant of outline planning permission within the meaning of section 92) which must be complied with—

 (a) before any building or other operation comprised in the development is begun, or

 (b) where the development consists of a material change in the use of any buildings or other land, before the change of use is begun.”

 This rules out use of the procedure on outline planning permissions! That certainly isn’t identified in the consultation paper. I can see why the procedure shouldn’t apply to the standard condition setting out the matters for which reserved matters approval is required but for all other pre-commencement conditions the position is the same as for full planning permissions.

The definition also has the effect of restricting the process to “pure” pre-commencement conditions. The requirement would not apply to a condition that prevented any development from proceeding save for defined initial works which might be very minor, but for which discharge might still be critical to the overall development programme, or to conditions that might need to be discharged before particular phases of development could proceed. “Pure” pre-commencement conditions are indeed a particular evil for developers as they will often be in the way of the planning permission being kept alive by the carrying out of an initial material operation (and may indeed lead to difficult CIL liability issues – set out in a good 5 January 2018 blog post CIL – false starts can be punishing by Roy Pinnock) but they are no more problematic for the timely carrying out of the whole development than other conditions.

What if an applicant resists a requested pre-commencement condition? Of course it is to be hoped that a compromise will be found. But if not, ultimately the decision maker’s only option may be refusal of the application.

What if a decision maker fails to follow the procedure and issues a permission with an unwelcome pre-commencement condition? In theory of course the applicant might consider challenging the permission by way of judicial review but surely this would be a sledgehammer to crack a nut as opposed to a section 96A or 73 application to amend the condition.
So that was all I had to say on a short consultation paper.
But what really has been on my mind this week has been the sad news of the death of retired Court of Appeal judge Sir Henry Brooke. As a lawyer and more specifically in the last few years as a legal blogger he was an inspirational figure to me. I didn’t know him personally but felt as if I did. His humanity, intellectual generosity, and wisdom – along with a healthy and undimmed preparedness to put technological advances and social media to practical use – was evident in all he blogged and tweeted. For instance, if you’ve benefited from the use of technology in court, or clicked into Bailii case transcripts? Thank Sir Henry. In the time I’ve saved you by this short post, do dip into his “musings, memories and miscellanea” blog, within which you will find this transcript of his 2008 Peter Boydell memorial lecture on The role of Mediation in Planning and Environmental Disputes. My condolences to Sir Henry’s family.

 Simon Ricketts, 2 February 2018