New Cabinet, Poor Doors, No Windows

La Sagrada Familia = our planning system. Never finished, it now has new architects.

I don’t know what new extrusions, reversals or pauses to expect from Robert Jenrick, Esther McVey and the rest of the MHCLG ministerial team yet to be announced.

I do know that Robert Jenrick was a member of the Commons Public Accounts Committee which published a report Planning and the broken housing market (19 June 2019). From the introduction:

The government has an ambitious target of delivering 300,000 new homes per year by the mid-2020s, but inherent problems at the heart of the housing planning system are likely to jeopardise this target. If the Government delivers 300,000 new homes per year, this would be a significant increase in the rate of house building, with the number built a year averaging only 177,000 in the period 2005–06 to 2017–18. While the Ministry of Housing, Communities and Local Government (the Department) has made some recent reforms to the planning system, much more needs to be done and it still does not have a detailed implementation plan for how it will scale-up house building.”

He knows something of the task ahead.

The report also says this:

We were concerned about poor quality in the building of new homes and of office accommodation converted into residential accommodation through permitted development rights. The Department stressed that it was critical that quality was good enough. It agreed that there are issues—particularly when dealing with large office blocks— that the number of homes created out of that office block can be too high, with inadequate space standards and build quality. The Department told us that it has committed to a review of permitted development rights which turn commercial properties into residential accommodation. This review will look at the quality of those homes and what should be built.

In the lead up to the new premiership, May’s Government seemed to have a renewed focus on the quality of homes and communities. I wanted to write something on the various strands within this theme, if only to capture a series of links to documents, before we lose the thread in a slew of new announcements.

Minimum dwelling sizes

My 23 March 2019 blog post We Have Standards referred to previous Secretary of State James Brokenshire’s March 2019 statement that he intended to “review permitted development rights for conversion of buildings to residential use in respect of the quality standard of homes delivered. […]. We will also develop a ‘Future Homes Standard’ for all new homes through a consultation in 2019 with a view, subject to consultation, to introducing the standard by 2025.”

Theresa May suggested in her 26 June speech to the Chartered Institute of Housing that, whilst it would ultimately be a matter for her successor, the nationally described space standard should apply “by regulation” to all new homes. As explained in my 23 March 2019 blog post, it is presently for each local planning authority to decide whether to incorporate the standard in their local plan as a policy requirement such that an applicant for planning permission then needs to demonstrate compliance.

I do not accept that, in 2019, we can only have sufficient and affordable housing by compromising on standards, safety, aesthetics, and space.

That is why I asked the Building Better, Building Beautiful Commission to develop proposals for embedding beautiful, sustainable and human-scale design into the planning and development process.

I look forward to reading the interim report next month.

It is why the Ministry of Housing will shortly be launching a consultation on environmental performance in new build homes, with a Future Homes Standard that will give all new homes world-leading levels of energy efficiency by 2025.

And it is why I want to see changes to regulations so that developers can only build homes that are big enough for people to actually live in.

It was the Addison Act that brought modern space standards to English housing law for the first time.

During the Bill’s second reading, the architect of the standards, Sir Tudor Walters, urged MPs to “take care that the houses planned in the future are planned with due regard to comfort, convenience, and the saving of labour”.

It is a message we would do well to return to today.

Because in the years since, the pendulum has swung back and forth between regulation and deregulation, leading to a situation today where England does have national standards – but ones that are largely unenforceable and inconsistently applied.

Some local authorities include the Nationally Described Space Standard in their local plans, making them a condition of planning permission.

But others do not.

And even where they are applied, as planning policies rather than regulations they are open to negotiation.

The result is an uneven playing field, with different rules being applied with differing levels of consistency in different parts of the country.

That makes it harder for developers to build homes where they are needed most.

And it leaves tenants and buyers facing a postcode lottery – if space standards are not applied in your area, there is no guarantee that any new homes will be of an adequate size.

Now I am no fan of regulation for the sake of regulation.

But I cannot defend a system in which some owners and tenants are forced to accept tiny homes with inadequate storage.

Where developers feel the need to fill show homes with deceptively small furniture.

And where the lack of universal standards encourages a race to the bottom.

It will be up to my successor in Downing Street to deal with this.

But I believe the next government should be bold enough to ensure the Nationally Described Space Standard applies to all new homes.

As a mandatory regulation, space standards would become universal and unavoidable.

That would mean an end to the postcode lottery for buyers and tenants.”

[Creating space for beauty: The Interim Report of the Building Better, Building Beautiful Commission was published in July 2019, sans its now reinstated chairman Sir Roger Scruton, who will be able to influence the tone of the Commission’s final report, due in December 2019. The interim report is a wide-ranging discursive read ending with 30 “policy propositions”. There is much good stuff about, in Theresa May’s words, “embedding beautiful, sustainable and human-scale design into the planning and development process”. None of its policy propositions urge prescription as to dwelling size, although there is this passage within its commentary:

Above all, polling and pricing data show that people are looking for homes that meet their needs and are in the right place. Every academic or commercial study we have been able to find has shown that, other things being held equal, bigger homes are worth more and so are better connected ones. For example, a study of every single property sale in six British cities showed that in, say, Liverpool, every additional bedroom brought an additional £15,000 of value. Similar patterns were visible in Leeds, Newcastle, Manchester, Birmingham and London. In their response to our call for evidence, the RIBA also highlighted their polling research into user needs that highlighted the importance of generosity of space, high ceilings, windows that flood principal rooms with light and detail that adds character”.]

Some I know disagree, but to my mind Theresa May’s statement missed the real target in relation to minimum dwelling sizes. At present authorities can apply the nationally described space standard if they so choose. But what authorities cannot prevent (other than by removing the relevant permitted development rights in the first place by way of Article 4 Direction) is the creation of very small dwellings pursuant to the General Permitted Development Order, the adequacy of the accommodation to be created not being one of the matters in relation to which prior approval is required under the Order. Either this needs to be a matter for which prior approval is required or it needs to be addressed by way of separate regulation.

Other minimum standards in relation to permitted development rights schemes

There is still so much misunderstanding as to the operation of permitted development rights. General horror has been expressed as to the permitted development appeal in Watford for the proposed conversion of a light industrial unit to apparently windowless bed-sit/studio accommodation, allowed by an inspector in his decision letter dated 5 July 2019:

Overall, I recognise that the proposed units are small and that, for example, living without a window would not be a positive living environment. However, the provisions of the GPDO 2015 require the decision makers to solely assess the impact of the proposed development in relation to the conditions given in paragraph PA.2. The appellant has also made clear that they are not proposing any external works at this stage.”

Photo: Watford Observer

The absence of any control over size of the proposed dwellings is indeed appalling, see my point above. But I am prepared to bet that the developer, now that he has prior approval to the use of the building as dwellings, will come back with an application for planning permission for the installation of windows and for the general recladding of the building. If it had all been applied for as one planning application, the authority would no doubt have objected to the principle of the change of use – just look at the sequencing of applications with most PD schemes and there is surely nothing wrong in that – the permitted development right just relates to use – and of course does not override other regulatory requirements.

Part B of the Building Regulations requires that every habitable room up to 4.5m from ground level either (1) has an openable window with dimensions of at least 45cm by 45cm, no more than 110cm above the floor or (2) (on the ground floor) opens directly onto a hall leading directly to an exit or (above the ground floor) with direct access to a protected stairway. Adequate ventilation is also required.

Since 20 March 2019 the Homes (Fitness for Human Habitation) Act 2018 also imposes specific requirements on landlords letting residential property for a period of less than seven years. In determining whether a dwelling is unfit for human habitation regard will be had to, amongst a range of matters, natural lighting and ventilation. MHCLG has published specific guidance for landlords as to the operation of the Act.

In considering whether further legislation or guidance is needed, ministers will need to consider carefully the extent to which the planning system should duplicate systems of protection provided in other legislation and where genuinely there are gaps that would allow unacceptable outcomes.

The Future Homes Standard

What of James Brokenshire’s reference in March of consultation on a proposed Future Homes Standard this year, with a view to introducing the standard by 2025? This was a reference to the commitment in the then Chancellor’s Spring budget to:

A Future Homes Standard, to be introduced by 2025, future-proofing new build homes with low carbon heating and world-leading levels of energy efficiency. The new standard will build on the Prime Minister’s Industrial Strategy Grand Challenge mission to at least halve the energy use of new buildings by 2030“.

There has not yet been any consultation. The House of Commons Business, Energy and Industrial Strategy Committee, in its 9 July 2019 report, Energy efficiency: building towards net zero, urged a greater sense of urgency:

We welcome the announcement of a Future Homes Standard. Any attempts by housebuilders to water down the standard should be blocked by the Government. The only barrier precluding housebuilders developing to higher standards before 2025 is a preoccupation with profit margins and shareholder returns. Despite receiving billions in taxpayer funds, most housebuilders will only raise the energy standards of their stock if forced to do so. Progressive housebuilders who want to go further are being held back by the laggards who actively lobby the Government to boost their profits, rather than help meet carbon reduction obligations.

We recommend that the Government legislates for the Future Homes Standard as soon as practically possible—and by 2022 at the very latest—to guarantee that no more homes by 2025 are built that need to be retrofitted. We recommend that the Government considers policy drivers at its disposal to drive early uptake. At a minimum, the Government should put in place a compulsory ‘learning period’ from 2022 in a subset of properties in preparation for the full-scale deployment. The Government should oblige bigger housebuilders to undertake regional demonstration projects to show how they will achieve the standard.”

Communities framework

MHCLG published a “communities framework” on 20 July 2019, entitled By deeds and their results:

How we will strengthen our communities and nation , expressed to be the “next step in refreshing the government’s aspirations for stronger, more confident communities. It provides a framework to build on a range of government activity that is contributing to stronger communities in different ways – from the implementation of the Civil Society Strategy and Integrated Communities Action Plan, to our efforts to boost productivity and inclusive growth through the Industrial Strategy and by supporting local industrial strategies across the country.

It promised that the Government will:

• Hold a national conversation with communities across England about their view of who we are as a nation, their vision for the future of their community and our country, and what local and national government can and should be doing to support their community to thrive.

• Establish a series of Civic Deal pilots to test how the Ministry for Housing, Communities and Local Government and the Department for Digital, Culture, Media and Sport put into practice the principles set out in this document in partnership with local areas.

• Publish a Communities White Paper to renew government’s focus on building stronger communities across England. The scope of the White Paper will be developed in partnership with communities and informed by the national conversation and Civic Deal pilots.”

Poor Doors

I referred in my 23 March 2019 blog post to widespread concerns over development projects where affordable housing tenants are prevented from using facilities provided for private market housing residents, for example children’s play areas and entrance/lift lobbies.

The basis for such arrangements may well be economically rational to the developer (preventing service charge leakage and/or preserving a sales premium in relation to the market units), to the registered provider (which would not be in a position to impose service charges high enough to cover the cost of the facilities provided for the market housing) and to the local planning authority (usually keen to protect the profitability of the development so as to secure the maximum amount of affordable housing that can be viably be delivered). But of course there can be wider, more damaging, implications.

On the same day as the communities framework was published, an MHCLG press statement Brokenshire unveils new measures to stamp out ‘poor doors’ announced there would be “measures to tackle stigma and help end the segregation of social housing residents in mixed-tenure developments…planning guidance will be toughened up and a new Design Manual will promote best practice in inclusive design.”

Meanwhile, as to we wait to see what the new ministerial team at MHCLG delivers, the Mayor of London’s new London Plan edges forward. We await the inspectors’ conclusions following their examination sessions but in the meantime the Mayor has published a Consolidated suggested changes version of the plan July 2019.

A specific policy has now been included to require that proposals likely to be used by children and young people should include good quality, accessible play provision that “is not segregated by tenure” (policy S4 B (f)).

Conclusion

With due deference to the list of banned words circulated by Mr Rees-Mogg:

Due to the ongoing change in ministers, with the old lot out, apparently unacceptable and no longer fit for purpose, I can only speculate as to the future of these initiatives. Hopefully I will ascertain more very soon.

I understand your concerns.

Simon Ricketts, Esq. 27 July 2019

Personal views, et cetera

Photo: Go UNESCO

Secretary Of State Throws Another Curve Ball

My 15 June 2019 blog post National Lottery: 2 Problematic Recovered Appeal Decisions focused on two appeals dismissed by the Secretary of State against inspectors’ recommendations.

Well, here is another one, in relation to the Chiswick Curve scheme on the Great West Road within the London Borough of Hounslow, the 19 July 2019 decision letter out just before Parliament rises on 25 July (by which date we will have a new prime minister). Another long inquiry (15 days), long delays (the initial application was made over three and a half years ago, the inquiry was a year ago), detailed analysis from an experienced inspector who had heard the evidence and seen the site first hand, ultimately counting for nothing.

The Secretary of State’s decision followed an inquiry held by inspector Paul Griffiths BSc(Hons) BArch IHBC, into appeals by Starbones Limited against the decisions of the London Borough of Hounslow to (i) refuse planning permission for a mixed use building of one part 32 storey and one part 25 storeys comprising up to 327 residential units, office and retail/restaurant uses, basement car and bicycle parking, residential amenities, hard and soft landscaping and advertising consent with all necessary ancillary and enabling works and (ii) refuse to grant advertising consent for 3x digital billboards. The applications were dated 11 December 2015 and amended in October 2016.

The differences of judgment as between the inspector and Secretary of State appeared to boil down to the following:

⁃ The Inspector considered “that the proposal would bring a massive uplift to the area around it” and would be in accordance with various local plan policies. “While the Secretary of State recognises that public realm improvements and the publicly accessible elements of the scheme…do offer some improvement to current conditions, in terms of accessibility and movement, he does not agree that this constitutes the massive uplift as described by the Inspector.

⁃ Both agreed that the harm to designated heritage assets (the Strand on the Green Conservation Area plus its listed buildings; Kew Green Conservation Area plus its listed buildings; Gunnersbury Park Conservation area plus its listed buildings and Registered Park and Garden, and the Royal Botanic Gardens Kew World Heritage Site plus its listed buildings) would be less than substantial but the Secretary of State disagreed with the inspector’s finding that the public benefits of the proposals would be sufficient to outweigh the harm.

⁃ The Secretary of State disagreed with the Inspector that there would be no conflict with a local plan policy concerning the impact of tall buildings proposed in sensitive locations such as conservation areas, listed buildings and their settings, and World Heritage Sites.

⁃ Accordingly the Secretary of State disagreed with the Inspector and found that the proposals did not comply with the development plan when read as a whole.

⁃ The Secretary of State “considers that the site has a strategic location, and he recognises the constraints and challenges associated with it. While he agrees with the Inspector […] that the proposed design seeks to respond to those challenges in a positive way, he does not find the proposal to be of such high quality as to be a brilliant response to its immediate context. He finds the scale and massing of the proposal to be such that the proposal does not relate to its immediate surrounding. While he recognises that attempts to minimise this impact have been taken with regard to glazing and fins, the building would still dominate the surrounding area. He considers the design to be a thoughtful attempt to respond to the challenges and opportunities of the site, but due to its scale, he disagrees with the Inspector […] that it is a significant benefit of the scheme.”

⁃ The Secretary of State considered that the proposals “would not provide the levels of private and communal amenity space that [the relevant local plan policy] requires. While he has found this to be a limited departure from this policy, the Secretary of State also recognises that the on-site provision, supplemented by the relative proximity of Gunnersbury Park does reduce the weight to be attached to this conflict.”

⁃ Given his finding that the proposals would not be in accordance with the development plan he went on to consider whether whether there were any material considerations to indicate that the proposals should be determined other than in accordance with the development plan. After a detailed analysis in paragraphs 34 to 38 of the decision letter, he concludes:

Overall, the Secretary of State disagrees with the Inspector […], and finds that the moderate weight to be attached to the benefits of the appeal scheme in terms of housing provision, workspace provision and economic benefits, are not collectively sufficient to outweigh the great weight attached to the identified ‘less than substantial’ harm to the significance of the above heritage assets. He considers that the balancing exercise under paragraph 196 of the Framework is therefore not favourable to the proposal.

Local MPs Ruth Cadbury (Labour) and Zac Goldsmith (Conservative) were recorded as having objected to the proposal. The objectors appearing at the inquiry included Historic England, the Royal Botanic Gardens Kew and the Kew Society (the first two instructing Richard Harwood QC and James Maurici QC respectively). Russell Harris QC and Richard Ground QC appeared for the appellant and for the London Borough of Hounslow respectively.

I note that on 19 July 2019, the Secretary of State also refused, against his inspector’s recommendation, Veolia’s called in application for planning permission for an energy recovery facility in Ratty’s Lane, Hoddesdon, Hertfordshire.

The Secretary of State accepted that there is an “urgent and pressing need” for the facility, that there is “no obvious alternative site”. “Given the urgent and pressing need, the Secretary of State considers that the provision of an ERF with sufficient capacity to accommodate the waste demands of the county carries substantial weight in favour of the proposal, and the climate change benefits of the proposal also carry substantial weight”. However, he considered that in view of the fact that the proposal was contrary to the development plan and there were unresolved concerns over highways matters, together with “significant adverse landscape and visual impacts”, the application should be refused. I thought that “need” means “need” but there we go.

Not much getting past this Secretary of State is there? An inference of his recent letter to the Planning Inspectorate (see my 13 July 2019 blog post Less Than Best Laid Plans: Political Pragmatism) might be that he considers that inspectors may on occasion be too robust in their examination of local plans and yet an inference of his approach on recovered appeals and call-ins might be that he considers that on occasion inspectors are not robust enough in assessing development proposals that are before them at inquiry. For my part, neither inference would be justified.

Simon Ricketts, 20 July 2019

Personal views, et cetera

Less Than Best Laid Plans: Political Pragmatism

The Secretary of State sent a curious letter to the Planning Inspectorate on 18 June 2019, which was only placed on the Government’s website on 28 June 2019. (The delay may have been to allow PINS to update its procedure guide for local plan examinations).

It is in two parts:

Sharing information with MHCLG

The Secretary of State reminds inspectors and local authorities that Parliament has given him “a number of powers that, where justified, allow [him] to become involved in plan making. This includes powers to notify or direct the Inspectorate to take certain steps in relation to the examination of the plan or to intervene to direct modification of the plan or that it is submitted to [him] for approval”. He states that he is “frequently asked by those affected by the plan making process to consider use of these powers and must look at each of these requests on a case by case basis. This includes requests from Members of Parliament, who have a legitimate interest in the progress of local plans in their areas and are accountable to their electorates. I am pleased that the Planning Inspectorate’s published Procedural Practice encourages MPs to participate in the examination hearing sessions even if they did not make a representation and I would encourage their involvement in this way”.

He considers that more can be done by way of sharing of factual information so that his officials can advise him as to whether use of his powers would be appropriate.

He sets out two changes to the arrangements for sharing of information between MHCLG and PINS with immediate effect:

1. On a quarterly basis the Planning Inspectorate will publish a report that sets out the plans that are expected to be submitted for examination in the following 6-month period. I ask that this report be published on the Planning Inspectorate website. Clearly this can only be as good as the information received from local authorities, and I am arranging for this to be drawn to the attention of local authorities to remind them of the importance of giving clear timetables;

2. The Planning Inspectorate will share all post-hearing advice letters, letters containing interim findings, and any other letters which raise soundness or significant legal compliance issues, as well as fact check reports, with my department on a for information basis, at least 48 hours in advance of them being sent to the Local Planning Authority

In relation to the second change, can I ask that we have on one website each of these documents as soon as they can be made public. There is a fundamental lack of transparency in the ad hoc way that this information is currently made available only on the relevant examination page of the particular local authority’s website, meaning that ensuring consistencies of approach, reviewing trends and learning from similar circumstances is currently very difficult indeed.

And what local plans have escaped to adoption before the relevant MP could ask the Secretary of State to apply the knife? Local Plan Intervention: a question of MP influence published by the House of Commons Library in July 2017 summarises the four times since the 2012 NPPF (to July 2017) when the Secretary of State had used his powers of intervention: Bradford, Birmingham, Maldon and North Somerset. In all but Maldon the intervention was at the request of an MP. I note that the MPs’ interventions only achieved delay to eventual adoption of the plan, whereas the call in of the Maldon plan was in circumstances where an inspector had found that the whole plan was unsound, due to its policies on traveller provision, the council’s chief executive successfully sought call in of the plan and the plan was eventually adopted.

Aside from the Secretary of State’s sabre rattling in relation to authorities that have not made sufficient progress with their plans, which I will come to in a moment, what interventions have there been since July 2017? Do we discern a continuing trend? Wouldn’t it be nice to have the information in one place so that potentially straight-forward questions such as that could be resolved. Is MPs’ interest more often in the “progress of local plans in their areas” or is it in being seen to be pressing in relation to those issues of most concern to their electorate eg retention of green belt and/or opposition to housing?

In fact, as I was typing this, in pinged a Planning magazine online update High Court allows legal challenge to Guildford local plan to proceed to full hearing (12 July 2019, behind paywall):

In May, Sir Paul Beresford, the Conservative MP for Mole Valley, wrote to several Guildford councillors expressing outrage at the “astonishing way” the plan had been adopted in the purdah period before local elections.”

Another Conservative MP on the “anti-housing in the Green Belt” campaign trail. Was this local plan perhaps “the one that got away” as far as MHCLG is concerned?

So how has the more general sabre rattling, in relation to delays in plan preparation, been going? My 18 November 2017 blog post Local Plan Interventions referred to the 31 January 2018 deadline given to 15 local authorities to set out any exceptional circumstances as to why they had failed to produce a local plan, to justify the Secretary of State not intervening in their local plan processes.

On 23 March 2018 the Secretary of State made a statement to the House of Commons, indicating that his attention had narrowed to three authorities: Castle Point, Thanet and Wirral:

In three areas, Castle Point, Thanet and Wirral, I am now particularly concerned at the consistent failure and lack of progress to get a plan in place and have not been persuaded by the exceptional circumstances set out by the council or the proposals they have put forward to get a plan in place. We will therefore step up the intervention process in these three areas. I will be sending a team of planning experts, led by the Government’s Chief Planner, into these three areas to advise me on the next steps in my intervention.

I have a number of intervention options available to me which I will now actively examine. As it may prove necessary to take over plan production, subject to decisions taken after the expert advice I have commissioned, my Department has started the procurement process to secure planning consultants and specialists to undertake that work so it can commence as quickly as possible. My Department will also be speaking to the county councils and combined authority with a view to inviting those bodies to prepare the local plan in these three areas as well as exploring the possibility with neighbouring authorities of directing the preparation of joint plans

Tough talk but it then took another ten months before intervention letters were finally sent to Wirral and Thanet on 28 January 2019.

The position in Castle Point is a mystery to me. Councillors voted down a proposed draft of the plan in December 2018. The council’s website simply says this:

A Special Council Meeting was held in November 2018, whereby the Council resolved to not proceed with the Pre-Publication Local Plan. As a result of this meeting the Council are in discussions with the Minstry of Housing, Communities and Local Government in regards to the next steps. “

But no intervention letter yet.

Sadly, if I worked for an authority I would presently be more concerned about the risk of the Secretary of State intervening in relation to a plan that has passed its examination and is about to be adopted than the risk of his intervening due to the lack of a plan in the first place or due to the authority’s withdrawal of a draft plan. We are seeing various authorities taking decisions to withdraw their submitted plans (for example East Cambridgeshire and Amber Valley) because they find the inspector’s findings, usually seeking further development allocations or additional housing numbers, unpalatable and there is still such slow progress on the part of many authorities. Surely this is the scourge – not plans which are within a process that has been refined by independent examination, the outcome of which happens to contradict the views of an MP, now encouraged to participate in hearing sessions “even if they did not make a representation”? In any world other than one in which backbench MPs have to be pacified, isn’t this madness?

The importance of being pragmatic

On the subject of pragmatism…

The second part of the Secretary of State’s 18 July letter comprises this final paragraph which I have already seen trotted out at an examination by one authority seeking to paper over the cracks:

Finally, on the substance of plan examinations, I wanted to stress to inspectors – who are doing a challenging job – the importance of being pragmatic in getting plans in place that, in line with paragraph 35 of the NPPF, represent a sound plan for the authority and consistent in how they deal with different authorities. We support and expect Inspectors to work with LPAs to achieve a sound plan, including by recommending constructive main modifications in line with national policy. In this regard, I would reiterate the views set out by the Rt Hon Greg Clark MP in his 2015 letter which I attach, on the need to work pragmatically with councils towards achieving a sound plan.”

I have since been trying to find an example of a local plan inspector in the last few years who has not been pragmatic in seeking to rescue a plan by way of main modifications rather than recommending withdrawal – and indeed the 2013/2014 spate of plans that failed examination were down to hard-edged legal failings in relation to the duty to cooperate.

Inspectors routinely allow pretty significant changes by way of main modifications, and general evidential backfilling, rather than recommend withdrawal. They routinely accept unenforceable assurances from the authority that the authority will carry out an early review – but at best “early” never means early and, at worst, as last week with the Reigate and Banstead plan, the authority’s (judge in its own cause) “review” determines that changes to the plan are not after all necessary!

So what is this paragraph getting at? If the Secretary of State were to be saying that inspectors should not be checking that legal requirements (eg the duty to cooperate and the need for adequate sustainability and habitats appraisals) have been met or that the plan meets the soundness test in NPPF, that would surely be wholly inappropriate. And shouldn’t we be protecting the independence of the Planning Inspectorate? Formal guidance is one thing, but “go easy” warning letters such as this surely just make an inspector’s task even more challenging.

Imagine equivalent guidance being given to appeal inspectors! Oh yes, bend over backwards to give the appellant time to amend elements of his scheme, overlook policy inconsistencies, fudge the approach to later phases of the development because the appellant has agreed, outside any enforceable timescale, to carry out an “early review” of those aspects. Doesn’t ring true, does it?

Simon Ricketts, 13 July 2019

Personal views, et cetera

What Really Is The Meaning Of Lambeth?

We held a dinner party for clients this week and after a certain amount of wine and gossip the conversation turned to a deeper question.

What really is the meaning of Lambeth?

The Supreme Court judgment’s judgment in London Borough of Lambeth v Secretary of State (Supreme Court, 3 July 2019) had been handed down that day.

Who hasn’t felt the same helplessness? You’re faced with a planning permission which does not say what the local planning authority plainly meant it to say. Do you go by what the document says? Or is its literal meaning changed by reference to what the authority intended?

Spoiler alert: Lambeth doesn’t provide the answer. It is specific to its facts. However it does provide another pointer as to the courts’ likely reaction to these sorts of issus. Following the approach of the Supreme Court in Trump International Golf Club Limited v Scottish Ministers (Supreme Court, 16 December 2015), Lord Carnwath indicates:

In summary, whatever the legal character of the document in question, the starting-point – and usually the end-point – is to find “the natural and ordinary meaning” of the words there used, viewed in their particular context (statutory or otherwise) and in the light of common sense.”

The facts of Lambeth are well set out in the Supreme Court’s press summary. A section 73 permission was issued which recited in the description of development the precise change that was authorised to be made to a condition on a previous 2010 permission restricting the types of goods that could be sold from a Homebase store but the local planning authority, whilst reimposing some conditions that were on the 2010 (including a condition imposing a three years’ implementation deadline) neglected to reimpose the condition restricting what types of goods could be sold and neglected to reimpose to other conditions (in relation to refuse and recycling and in relation to management of deliveries and servicing).

I summarised Lang J’s first instance ruling in my 14 October 2017 blog post Flawed Drafting: Interpreting Planning Permissions. She restricted herself to a formalistic interpretation of the permission. There was no condition restricting the types of goods to be sold. The description of development on the permission does not operate as a condition. There was therefore no operative restriction – there was nothing to prevent the shop being turned into, for instance, a food superstore. Some mistake on the part of the authority. Some windfall for the owner of the store, Aberdeen Asset Management. I speculated that the ruling might be overturned by the Court of Appeal but in fact they took the same line, in a judgment by Lewison LJ (Court of Appeal, 20 April 2018).

However, the Supreme Court has allowed the authority’s appeal. It found that the very nature of a section 73 permission is that it grants permission subject to a condition as varied. The document was “clear and unambiguous”, with the description of development setting out the “original wording” of the condition to be varied and the “proposed wording”. ““Proposed wording” in this context must be read as a description of the form of condition proposed in the application and “hereby” approved. In other words, the obvious, and indeed to my mind the only natural, interpretation of those parts of the document is that the Council was approving what was applied for: that is, the variation of one condition from the original wording to the proposed wording, in effect substituting one for the other. There is certainly nothing to indicate an intention to discharge the condition altogether, or in particular to remove the restriction on sale of other than non-food goods.

This reasoning will apply to other situations where the nature of the amendment proposed to a condition is set out precisely in the description of development. Where there is not that precision, clearly there will still be room for argument.

What about the two conditions which were not reimposed? I find this part of the court’s reasoning difficult, or at least potentially opening up further areas of uncertainty:

It will always be a matter of construction whether a later permission on the same piece of land is compatible with the continued effect of the earlier permissions…In this case, following implementation of the 2010 permission, the conditions would in principle remain binding unless and until discharged by performance or further grant. Conditions 2 and 3 were expressed to remain operative during continuation of the use so permitted. The 2014 permission did not in terms authorise non-compliance with those conditions, nor, it seems, did it contain anything inconsistent with their continued operation. Accordingly, they would remain valid and binding – not because they were incorporated by implication in the new permission, but because there was nothing in the new permission to affect their continued operation.”

So a potentially difficult exercise is required on a site with successive permissions (including section 73 permissions) – of working out which conditions from previous permissions continue to apply, even though the planning permission itself may have been superseded.

Two last points:

⁃ What of the reimposed time limit condition? People sometimes get themselves in an intellectual knot in relation to section 73 permissions granted after the physical development authorised by the previous permission has been completed. Does the section 73 permission need to be implemented in some way? Can an authority in fact grant a section 73 permission in these circumstances. Thankfully, the Supreme Court didn’t have any concerns along these lines. It agreed with the Court of Appeal that the condition was invalid, in circumstances where the development had already been carried out.

⁃ another worry sometimes – was the purported permission such a nonsense that it was of no legal effect despite no-one having challenged its validity in the six weeks’ JR time limit? Again, the Supreme Court showed no worries on that score:

If section 73 gave no power to grant a permission in the form described, the logical consequence would be that there was no valid grant at all, not that there was a valid grant free from the proposed condition. The validity of the grant might perhaps have been subject to a timely challenge by an interested third party or even the Council itself. That not having been done, there is no issue now as to the validity of the grant as such. All parties are agreed that there was a valid permission for something. That being the common position before the court, the document must be taken as it is.”

On the facts I do support the outcome. The lower courts’ approach seemed to fly in the face of common sense – of the meaning that any reader of the document (other than a planning lawyer perhaps!) would have given to it. But I do recognise the difficulties that can arise, as identified in a post by Zack Simons.

The tension between literal versus “following the formalities regardless of the words” interpretation will always be there. We have all seen so many variants of permissions that do not quite say what they are meant to say, and who can blame planning officers for sometimes not getting it quite right.

For instance, despite the provision in section 73(5) of the 1990 Act, preventing section 73 permissions from varying the time limits that were imposed on the original permission for implementation or reserved matters submissions, the restriction is overlooked from time to time and fresh time limits are set. Once free from the risk of JR, can the new time limits be relied upon? On the approach in Lambeth, my provisional view is that I don’t see why not. The natural and ordinary meaning of the permission is clear and once free from legal challenge surely there is a valid permission. Even where a permission is issued in a flawed state without legal authority, as in the Thornton Hotel case (see my 18 May 2019 blog post Slow Claim Coming: Limiting JRs https://simonicity.com/2019/05/18/slow-claim-coming-limiting-jrs/ ), the courts will apply strict criteria before the validity of a permission to be challenged after the usual deadline.

Two more planning law cases are heading to the Supreme Court. Whilst permission to appeal was refused in the air quality case, Shirley, we can look forward to the Supreme Court justices applying their minds on 22 and 23 July to the vexed area of community benefits in Resilient Energy and, on a date to be fixed, to the question of what is a listed building in Dill.

Aren’t I the life and soul of the dinner party?

Simon Ricketts, 4 July 2019

Personal views, et cetera

It’s a sign.