Street Votes!

I know we are all trying to wind down, or maybe are slumped there fully unwound already, I do know that, I do see you. However, I couldn’t let a DLUHC consultation paper just slip out unnoticed on 22 December…

The Government’s consultation paper on street votes development orders landed this afternoon. The consultation period closes on 2 February 2024

You will recall that this new potential consenting route for domestic development was teed up by section 106 of the Levelling-up and Regeneration Act 2023, which shoehorns new sections 61QA to 61QM into the 1990 Act.

The consultation paper summarises as follows how SVDOs will work in practice:

11. A group of residents which meets certain requirements will be able to come together with a proposal for permission to be granted for development on their street, for example the addition of an extra storey to properties. The proposal can be put forward by the group of residents directly or with the assistance of an individual such as an architect.

12. The proposal will be examined by the Planning Inspectorate on behalf of the Secretary of State to check that the proposed development is in scope and that requirements prescribed in secondary legislation are met. These requirements will help ensure that development meets high design standards and that local impacts are taken into account.

13. If the proposal passes the examination, it is then put to a referendum. Where the required threshold of votes is met, subject to any final checks, the Planning Inspectorate will make the street vote development order on behalf of the Secretary of State. Once the street vote development order is made, granting planning permission, a person with control of the land can then decide whether they want to take forward development.

14. Where street vote development takes place, local authorities will be able to capture value from the new development via the Community Infrastructure Levy and, when it is introduced, the new Infrastructure Levy, and use it to fund infrastructure that will support the local area.”

The Government proposes that for the procedure to be available there will need to be at least ten residential properties in the street, with rules as to the minimum size of the qualifying group of voters and percentage of votes required as follows:

It is proposed that any proposal must include:

  • “a signed and witnessed letter from members of the qualifying group declaring that they support the proposal, where a proposal has been submitted on their behalf
  • a map which identifies the street area and the land in that street area to which the proposal relates
  • a draft order which includes a description of the development to which the order relates and any proposed planning conditions
  • any necessary supporting information such as impact assessments or statements. Further information is set out in the “Managing local impacts” section of this consultation
  • details of any consultation with statutory bodies
  • a declaration that the qualifying group has engaged with the local community”

“21. In addition, we propose that qualifying groups (or those acting on their behalf) must submit a street design code that sets out illustrated design parameters for physical development within the street area such as number of floors, plot use and the facade treatment of buildings.

22. We also propose qualifying groups (or those acting on their behalf) will have the option to submit a detailed specification of the elevations visible from public spaces for new or extended buildings that are permitted in the street area. If these are submitted, they must include at least one detailed elevation drawing for facades facing public spaces. Specifications of elevations not facing public spaces are optional. Qualifying groups may provide various façade options if a varied streetscape is desired.

23. If plot widths in the street area vary, the specification must include requirements on how the elevations can be adapted to deal with such variation. If they wish, qualifying groups may also choose to include permitted elevations for wider buildings that can be created by merging plots e.g. an elevation for a small mansion block created by merging three existing plots.”

A ”street area” is to be defined as “the properties on each stretch of road starting or ending at a crossroads or as a minor road at a T-junction or where there is a gap between buildings of more than 50 metres. A street is treated as terminated if the continuous stretch of buildings is broken by a bridge wider than 3 metres. This applies to both the street running beneath and over the bridge. A residential property is counted as being in a street area if any part of its boundary runs along the highway. The street area must have at least 10 residential properties within its boundary. We also propose that adjoining streets could be joined together to form one street area, for example, joining together two streets that have fewer than 10 residential properties.”

Detailed design requirements are set out in a table at paragraph 35 of the consultation document, informed by six design principles:

  • Supporting a gradual evolution in the character of neighbourhoods
  • Limiting impacts on neighbours
  • Preserving green space and increasing outdoor space (including balconies)
  • Celebrating heritage
  • Promoting active travel
  • Creating sociable neighbourhoods

If you look at the paragraph 35 table you will see that there is much detail as to for instance, the maximum number of extra storeys (dependent on the density of the area); setbacks; basements; angled light planes; ceiling heights and corner properties.

It is proposed that “street vote development orders should be permitted to go beyond that which might be permitted under the local development plan where the impacts are broadly acceptable in the view of the Secretary of State according to national policy, and it will not cause problems with the implementation of the local plan.

If the proposal survives examination and the necessary referendum, the Government hasn’t yet decided how long property owners will have to commence development:

  • Option A: Development must be commenced within 10 years of the order being made. This is longer than is typically allowed for planning permission granted through existing consent routes because the permission will potentially apply to properties under many different owners, some of which may not be able to commence development within a shorter period (e.g. 3 years). The qualifying group would also have the option to propose an increase to this period as part of its proposal if it takes the view more time is needed to commence development;
  • Option B: Development must be commenced within a specified period (e.g.10, 20 or 30) years of the order being made. The qualifying group would also have the option to apply to the local planning authority after the order has been made to extend the commencement period; and
  • Option C: No time period. Permission granted through a street vote development order would be permanent.”

In summary, there’s a lot here for local planning authorities, planning professionals and (above all) home owners to get their heads around. The concept has been widely lobbied for by eg Policy Exchange, Create Streets and YIMBY. I’ll be interested to see the extent to which ultimately there is take-up and, aside from the inevitable definitional problems with any rules-based process such as this, of course there are some open questions as to the extent to which this process, alongside continuing extensions of permitted development rights and the prospect of national development management policies, further marginalises the role of the local planning authority. And does anyone remember neighbourhood development orders and all of that malarkey…?

But something to be picked up again on the other side, as they say.

In the meantime, peace to all in 24 – even to those I may be seeing across a planning inquiry or court room!

Simon Ricketts, 22 December 2023

Personal views, et cetera